Back to Blog

Deal Analysis

Hard Money Loan Terms Explained: What Every Fix-and-Flip Investor Should Know

LendlyX Team10 min read

Hard money loan terms can be confusing. Learn what LTC, LTV, points, interest reserves, and draw schedules mean — and how they affect your cash-to-close.

Hard Money Loan Terms Explained: What Every Fix-and-Flip Investor Should Know

Hard money loans are the engine behind most fix-and-flip projects — but the terminology can be confusing, especially if you're coming from traditional mortgage lending.

This guide breaks down every term you'll encounter on a hard money term sheet, explains what it actually means for your deal, and helps you compare lenders intelligently.

The Basics

Loan-to-Cost (LTC)

The percentage of the total project cost (purchase + rehab) that the lender will finance.

Example: Purchase at $200,000 + $50,000 rehab = $250,000 total cost. At 90% LTC, the lender provides $225,000.

Why it matters: LTC determines how much cash you need to bring to the deal. The higher the LTC, the less out-of-pocket capital required.

Loan-to-Value (LTV) / Loan-to-ARV (LTARV)

The percentage of the property's after-repair value that the lender will lend.

Example: ARV of $350,000 at 70% LTV = maximum loan of $245,000.

Why it matters: Even if a lender offers 90% LTC, they may cap the loan at 70–75% of ARV. The lower of the two calculations determines your actual loan amount.

Points (Origination Fees)

Upfront fees charged as a percentage of the loan amount. 1 point = 1% of the loan.

Example: 2.5 points on a $225,000 loan = $5,625 due at closing.

Why it matters: Points are a significant cost that investors often underestimate. They're typically deducted from loan proceeds at closing, reducing your net funding. Use the LendlyX DealScore to see how points affect your cash-to-close.

Interest Rate

The annual rate charged on the outstanding loan balance, typically ranging from 10–14% for hard money.

Important distinction: Most hard money loans charge interest monthly on the outstanding balance. Some charge on the full loan amount (including undisbursed rehab funds), while others only charge on funds actually advanced.

Interest Reserve

A portion of prepaid interest held in escrow at closing. This ensures the lender receives interest payments even if the borrower has cash flow issues during rehab.

Example: 6-month interest reserve on a $225,000 loan at 12% = $13,500 held from proceeds.

Loan Term

The total time you have to complete the project and repay the loan. Typical terms: 6, 9, or 12 months.

Extension options: Most lenders offer 3–6 month extensions for an additional fee (typically 0.5–1 point).

Draw-Related Terms

Draw Schedule

The structured plan for how rehab funds are released. See our complete guide to draw schedules.

Rehab Holdback

The portion of the loan allocated for rehab costs, held in escrow and released through draws as work is completed.

Draw Fee

Some lenders charge a fee ($100–$250) for processing each draw request. This covers the cost of review and verification.

Inspection Requirement

Whether the lender requires a physical property inspection for each draw. Many lenders are moving to photo-verified draws to reduce costs and speed up the process.

Fee Terms

Fee TypeTypical RangeWhen Charged
Origination points1.5–3.5%At closing
Processing fee$500–$1,500At closing
Underwriting fee$500–$1,000At closing
Doc prep fee$250–$500At closing
Draw fee$100–$250Per draw request
Inspection fee$150–$300Per draw (if required)
Extension fee0.5–1 pointAt extension
Prepayment penalty0–3 months interestAt payoff (if applicable)
Wire fee$25–$50At closing and payoff

How to Compare Term Sheets

Don't just compare interest rates. Here's a framework:

1. Calculate total cost of capital. Add up all fees (points, processing, underwriting, draw fees, inspection fees) plus total interest for your expected hold period.

2. Compare cash-to-close. Two lenders with identical LTC ratios can have very different cash requirements depending on how fees are structured.

3. Factor in speed. A lender that processes draws in 2 days vs. 10 days saves you 8 days of holding costs per draw.

4. Model multiple hold periods. Run the numbers at your expected timeline, then add 3 months. The "cheapest" lender often changes when the project takes longer than planned.

The LendlyX DealScore lets you compare up to three financing scenarios side by side, accounting for all these variables.

Red Flags in Term Sheets

Watch out for:

  • Prepayment penalties that extend beyond your expected hold period
  • Interest charged on full loan amount from day one (including undisbursed rehab)
  • Mandatory inspection fees for every draw (adds $600–$1,500 per loan)
  • No extension option — what happens if your project runs long?
  • Vague draw language — how long does the lender guarantee for draw processing?

The Bottom Line

Hard money terms aren't complicated once you understand the vocabulary. The key is looking beyond the headline rate and calculating the total cost for your specific deal and timeline.

Plug your term sheet into the LendlyX DealScore and see exactly what your deal looks like — cash-to-close, monthly costs, and projected ROI — before you sign.

Share:LinkedInX
  1. 1People
  2. 2Evidence
  3. 3Property
  4. 4Decisions

About LendlyX

LendlyX is Lending Intelligence Infrastructure for private real estate lending. LendlyX verifies every identity, document, and inspection photo behind a loan before capital moves — replacing the spreadsheets, scattered emails, and manual review that put capital at risk. Founded in Dallas, TX, LendlyX serves private lenders, capital providers, and real estate borrowers nationwide.

Media Contact: media@lendlyx.com | www.lendlyx.com

Ready to streamline your workflow?

See how LendlyX helps borrowers and lenders work better together.